Header manufacture and installation

we were called to a breakdown of a header leaking which turned out to be a lamating fracture on the steel body.

after speaking with the customer we were instructed to replace the failing valves,steam trap and manufacture a header to the same spec as before but with inspection blanks.

header was manufactured in 3 days to a high spec and then installed over a weekend to minimise intruption on the working plant.

Great work from the team at H&R!

New steam boiler install

This was a full installation with out clients already bought new boiler and design (model, p&id and specs)

all fabricated and installed by the team at H&R

plantroom for air source heat pumps 

This install was for a carehome including manufacture of headers within a tight deadline.

 

cooling tower upgrade

a faulty motor diagnosed by site ended up been a full replacement of motors to the fans and electrical upgrade.

Mechanical installation for heating and decarbonisation

this project was for a major building contractor including heating, decarbonsation systems and cooling.

the project lasted multiple months with all fabrication and installation carried out to a high standard

gas meter installation

we installed a gas meter on behalf of a oven manufacture for there installation team to connect too